Rebuild report

Did you try to build one of these?

A design nobody has rebuilt is a claim rather than a tool. Attempts that stalled or failed are as useful as ones that worked: they tell the next laboratory what the documentation leaves out. Reports are not scores, and the Atlas does not rank builds.

What you built

What it actually took

Published costs frequently exclude the printer or robot the design mounts on. What you actually paid, and how long it actually took, is the number the next laboratory needs.

What the documentation missed *

Parts absent from the bill of materials, steps that were unclear, files that would not open, tolerances that mattered.

Anything you measured

Optional, and the most valuable part if you have it. A figure you checked yourself, how you measured it, and the standard you measured against.