Open biofabrication builds

Filter by cost, licence, design files, skill and reported performance.

60 builds

Click the name to open · click the card to inspect

— means the source records nothing, not that the answer is no.
+ host and * mark a cost that excludes the printer or robot arm the design mounts on.
? marks a figure whose source names no currency, shown as USD. Costs are as each paper states them, not converted between currencies or adjusted for inflation.
Build/skill is the parts-sourcing score / the skill-needed score, each out of 5, higher is easier; across this corpus both run 2–4 rather than the full 1–5, so a 3 is the middle of the field.
Reports shows five marks, one per performance measurement a laboratory needs — motion accuracy, volumetric accuracy, cell viability, unattended operation, compliance with a standard — coloured where the paper states a number and grey where it does not. Dashed marks mean the full text is not held, so the question is unanswered rather than answered no.
How this index is built · API ·Relationship graph · Propose a paper